Building in Benidorm.
The intervention required a fast, safe solution with minimal impact on residents and the urban environment. We chose a motorised modular system which allowed smooth work on the facade, ensuring stable access at height and without interfering with the building’s activity. A clean and efficient operation in one of the most active residential zones of the Costa Blanca.